Renovating a bathroom, kitchen or laundry? We handle the plumbing from rough-in to fit-off, working around your builder and other trades to deliver modern, functional results that are done right the first time.
Whether you're doing a full renovation or just moving a few fixtures, the plumbing needs to be planned and done properly before the walls are closed up.
New showers, baths, vanities and toilets, including relocating fixtures.
Sinks, mixers, dishwashers, fridge water lines and island benches.
Tubs, washing machine connections and relocated laundries.
Relocating toilets, showers or sinks to suit a new layout.
Upgrading or relocating your hot water system as part of the job.
Plumbing for new bathrooms and kitchens in additions.
Every stage of the plumbing, coordinated with your project.
We plan the pipework for your new layout and install water and waste lines before the walls and floors are closed in.
Once tiling and cabinetry are done, we install toilets, basins, showers, baths, sinks and tapware with precision and care.
We coordinate with your builder, tiler and electrician so the plumbing happens at the right stage and the project keeps moving.
A few things that make renovation plumbing smoother and cheaper.
Tom was amazing. Great service from the team, quality workmanship and a really fair price. Will definitely be recommending to friends on the Gold Coast.
As early as possible, ideally before demolition. Your plumber needs to plan pipe positions for the new layout, and rough-in has to happen before walls and floors are closed up.
Usually, yes. It depends on where the waste lines run and the floor construction. We'll check on site and include it in your written quote.
We can install fixtures you've chosen and bought yourself, or supply them for you. Either way, our workmanship warranty covers the installation, and the products are covered by the manufacturer's warranty.
Yes. We regularly work alongside builders, tilers and electricians, and we'll coordinate timing so the plumbing is done at the right stages.
We don't identify, remove or handle asbestos. If your renovation area may contain asbestos, it needs to be removed by a licensed professional before our work begins.
Book before 12pm for same-day service. Book online in 60 seconds or give us a call.